Turnkey Industrial Automation Projects

Sysnix delivers complete automation projects from requirement study and control philosophy through electrical panels, PLC and SCADA engineering, field integration, FAT, site commissioning and handover. One coordinated team manages the interfaces between controls, instruments, drives, software and production equipment.

Turnkey Automation capabilities

Typical applications

Business and engineering outcomes

One coordinated scope

Panels, controls, drives, instruments, software and site interfaces are engineered against one approved architecture.

Controlled acceptance

URS, design reviews, FAT, SAT and punch-point closure make completion criteria visible to all teams.

Production-ready handover

Operators and maintenance teams receive backups, drawings, training and recovery information.

Lifecycle continuity

The as-built baseline supports later troubleshooting, expansion, spares and modernization.

Engineering and delivery approach

  1. Discover: Survey the process, loads, instrumentation, existing systems, interfaces, shutdown limits and business targets.
  2. Define: Freeze the control philosophy, architecture, I/O, drawings, acceptance tests, responsibilities and exclusions.
  3. Engineer and build: Develop panels, PLC, HMI, SCADA, networks and reports with staged internal reviews.
  4. Test and commission: Execute FAT, site checks, loop tests, dry trials, production trials and documented punch closure.
  5. Handover: Deliver as-built files, settings, source backups, training, support contacts and recommended spares.

Platforms, protocols and components

Control

Electrical

Project assurance

What we need to start

Project deliverables

Frequently asked questions

What does a turnkey automation project include?

The agreed scope can include survey, design, panels, PLC and SCADA software, field integration, testing, commissioning, documentation and training.

Can Sysnix modernize a running plant in phases?

Yes. Brownfield projects can be divided into surveyed shutdown windows, temporary interfaces and staged cutovers to reduce production risk.

How is project scope controlled?

The project begins with documented inputs, exclusions, interfaces, acceptance criteria and a change-control method before detailed engineering starts.

Do you provide FAT and SAT records?

Yes. Test plans, observations, punch points and acceptance records are prepared according to the agreed project documentation scope.

Related automation services

Request an industrial automation consultation